Wednesday, 26 January 2011UC San DiegoLa Jolla, CA
| ||
| 8:00 | Coffee, Light Breakfast, Socializing, and Laptop Connections | UCSD host |
| 8:30 | Welcome, Meeting Logistics and Introductions | M. Tillack |
| 8:40 | Summary of Agenda | L. Waganer |
Plans and General Scope | ||
| 8:45 | Status and Update on Current ARIES project | F. Najmabadi |
ARIES Task Results | ||
| 9:15 | Comments on the 1/2011 Strawman (ppt) | L. El-Guebaly |
| 10:00 | Break | |
| 10:15 | Needful Systems Code Modifications (ppt) | L. Carlson |
| 10:45 | Updates and Status of the ARIES Systems Code (pdf) | C. Kessel |
| 11:15 | Engineering Models in the ARIES System Code, Part II (ppt) | M. Tillack |
| 11:45 | Update on GA Contributions and Plans for ARIES (pdf) | A. Turnbull |
| 12:15 | Lunch (includes lunch meeting with GA participants) | |
| 1:45 | Poloidal Distribution of ARIES-ACT Neutron Wall Loading (ppt) | L. El-Guebaly |
| 2:15 | Further optimization of the T-tube divertor design (ppt) | J. Burke |
| 2:45 | Modeling of thermal creep for divertor joint (pptx) | D. Navaei |
| 3:15 | Updates on design and analyses of the plate-type divertor (ppt, pdf) | X. Wang |
| 3:45 | Break | |
| 4:00 | Update on Metrics for MFE/IFE Progress toward ARIES (ppt) | D. Meade |
| 4:30 | Update on the Fusion Nuclear Science Program Study Activity (Excel Parameter List) | C. Kessel |
| 5:00 | Action Items Assigned/Next Call/Next Meeting/ Discussion of Future Plans | F. Najmabadi/L. Waganer |
| 5:30 | Adjourn Meeting | |