Research Presentations, Room 1025
University of Wisconsin, Madison
Thursday 27 April 2006 | ||
| 8:00 | Coffee | UW Hosts |
Administrative/General |
||
| 8:30 | Welcome to UW | J. Kulcinski |
| 8:40 | Logistical Information | L. El-Guebaly |
| 8:45 | Review of Meeting Agenda | L. Waganer |
| 8:50 | Status of ARIES-CS study and Purpose of Meeting | F. Najmabadi |
Compact Stellarator Power Plant Integrated System Assessment |
||
| 9:00 | Assessment of Power Core Parameters and Related Costs (pdf ) | L. El-Guebaly |
| 9:20 | Systems Code Results: Impact of Physics and Engineering Assumptions (pdf ) | J. Lyon |
| 10:35 | General Discussion of Systems Code Results | All |
| 10:45 | Break | |
Compact Stellarator Power Plant Physics Basis |
||
| 11:00 | New Development in Plasma and Coil Configurations (pdf, PowerPoint) | L-P Ku |
| 12:00 | Lunch | |
| 1:00 | Update on Beta Limits for Compact Stellarators (pdf , PowerPoint ) | A. Turnbull |
| 1:30 | Divertor Heat Load Analysis and Derived Geometry (pdf ) | T. K. Mau |
| 2:00 | General Discussion of Physics Basis | All |
| 2:20 | Break | |
Compact Stellarator Power Plant Engineering Assessment |
||
| 2:30 | Near-Final Radial Build and Nuclear Parameters (pdf ) | L. El-Guebaly |
| 3:00 | Status of CAD/MCNP 3-D Analysis (pdf , Power Point ) | P. Wilson |
| 3:15 | Reactor Building Concept Assessment (pdf , Power Point ) | L. Waganer |
| 3:30 | Experimental Verification of Gas-Cooled T-Tube Divertor Performance (pdf , Power Point ) | S.Abdel-Khalik |
| 4:00 | Design Definition of Stellarator Coil Systems (pdf ) | L. Bromberg |
| 4:30 | Design Definition and Magnetic-Structural Analysis of Coil Structure (pdf ) | X. Wang |
| 5:00 | Updates of the ARIES-CS Power Core Configuration and Maintenance (pdf ) | X. Wang |
| 5:30 | Adjourn | |
Friday 28 April 2006 |
||
| 8:00 | Coffee | UW Hosts |
Compact Stellarator Power Plant Engineering Assessment (cont'd) |
||
| 8:30 | Design Definition of Divertor Support (pdf , Power Point ) | R. Raffray |
Compact Stellarator Radwaste Management and Safety Analyses |
||
| 9:00 | Recommended Change to ARIES Top-Level Radwaste Requirement (pdf ) | L. El-Guebaly |
| 9:20 | Safety Studies for Port-Based Maintenance (pdf , Power Point ) | B. Merrill |
| 9:50 | Status of Finalizing Power Core Engineering Baseline (pdf , Power Point ) | R. Raffray |
| 10:20 | Break | |
| 10:30 | Discussion, Action Items, and Plans | F. Najmabadi |
| 11:00 | Adjourn | |