Power Core Design Configuration
Previous Slide
Overview
|
Next Slide 3D CAD modeling
|
A New NBI Power Core Plan View
(see New NBI power core plan
view, showing NBI)
Highlight new major elements of the power core
Flare
centerpost at the bottom of the core to
allow removal of the centerpost through bottom independently, without
disturbing the whole power core.(see power core
elevation view)
Size and
locate NBI penetration.(see NBI elevation
view) and (see NBI power core
plan view, showing NBI)
Optimize
the transition region between the inboard FW and divertor.
The outboard TF shell shoulder near the centerpost is adequately shielded to be
life-of-plant.
Recommend
vacuum path through outboard divertor area and TF shell; Pump on space behind
Helium manifolds and inside TF shell.(see vacuum
path and pumping space- elevation view)
Develop
the outboard first wall manifold and coolant ring headers. (see continuous
outboard blanket cross section,half-core) and (see continuous
blanket cross section, close-up)
(see original
(modular) outboard blanket and first wall box)
Revisit
power core assembly sequence. (see power core assembly
sequence- elevation view 1)
(see power core assembly
sequence- elevation view 2)