Thursday, 29 July 2010Doubletree HotelBethesda, MD
| ||
| 8:30 | Coffee, Light Breakfast, Socializing, and Laptop Connections | DOE host |
| 9:00 | Welcome, Meeting Logistics and Introductions | A. Opdenaker |
| 9:10 | Summary of Agenda | L. Waganer |
Plans and General Scope | ||
| 9:15 | DOE expectations for ARIES Team (pptx) | A. Opdenaker |
| 9:45 | FNS pathways assessment - scope and plans (ppt, pdf) | C. Kessel |
| 10:15 | Issues, metrics and gaps for the development of fusion power (ppt) | D. Meade |
| 10:45 | Break | |
| 11:00 | Simple analytic formulae for insight into pilot plant operations (ppt) | J. Sheffield |
| 11:30 | ARIES Pathways planned and possible new efforts | F. Najmabadi |
| 12:00 | Lunch | |
ARIES-PATHWAYS Task Results | ||
| 1:00 | ARIES systems analysis: four corners identification
(ppt, pdf) Systems Code - Hardwired Numbers for Review (ppt, pdf) |
C. Kessel |
| 1:30 | Exploring the parameter space with the Visual ARIES Systems Scanning Tool (ppt) | L. Carlson |
| 2:00 | No ELM, small ELM and large ELM strawman scenarios (ppt, pdf) | A. Turnbull |
| 2:30 | Discussion of systems activity | F. Najmabadi |
| 3:00 | Break | |
| 3:15 | Overview of engineering activities (ppt) | M. Tillack |
| 3:25 | Update on FW armor design and inelastic analyses (pdf) | X. Wang |
| 3:55 | Extrapolating Experimental Results for Model Divertor Studies to Prototypical Conditions (ppt) | M. Yoda |
| 4:40 | Concept development of pin-fin cooled divertors (ppt) | M. Tillack |
| 5:00 | Update on high performance divertor design and analysis (pdf) | X. Wang |
| 5:30 | Adjourn | |
Friday, 30 July 2010Doubletree HotelBethesda, MD
| ||
| 8:30 | Coffee, Light Breakfast, Socializing, and Laptop Connections | DOE host |
| 9:00 | Summary of today's agenda | L. Waganer |
ARIES-PATHWAYS Task Results | ||
| 9:05 | 3D assessment of neutron streaming through assembly gaps: outboard options (pdf) | L. El-Guebaly |
| 9:35 | Electrical resistivity changes with neutron irradiation and implications for W stabilizing shells (pdf) | L. El-Guebaly |
PMI issues and concerns | ||
| 10:05 | PMI risks and future data sources (pdf) | R. Goldston |
| 10:35 | Break | |
ARIES Town Meeting Discussion | ||
| 10:50 | ARIES Town Meeting summary and recommendations (ppt) | M. Tillack |
Administrative | ||
| 11:35 | Action Items Assigned/Next Call/Next Meeting/Discussion of future plans | F. Najmabadi |
| 11:55 | Adjourn meeting | |