Red Lion Hotel Conference Center, Sawtooth Room
Idaho Falls, ID
Thursday, 6 September 2007
| 8:30 | Welcome, Meeting Logistics, Agenda | P. Sharpe, L. Waganer | 8:40 | Highlights of 2nd IAEA TM on 1st Gen. of Fusion Power Plants | L. El-Guebaly | 9:00 | Status and Update on Project Pathways | F. Najmabadi | 9:15 | Plans to Utilize Advisory Committee | K. Schultz | ARIES-Pathways Systems Code Development | 9:45 | Progress on Engineering and Cost Algorithms for the Systems Code (ppt, pdf) | Z. Dragojlovic | 10:45 | Break | 11:00 | Progress on Systems Cost Accounts and Algorithms
(ppt,pdf) Excel files: Fabrication Costs per kgRevH(090407), GDP Current (083007 Chained with Deflators from BEA), New Recommended Cost Accounts |
L. Waganer | 11:30 | Progress on Systems Code Engineering and Physics Validation | C. Kessel | 12:00 | Lunch | ARIES-Pathways Task Results | 1:00 | How I &C Evolution (and some Revolutions) will help ITER Evolve into DEMO (ppt,pdf) | Tom Weaver | 1:30 | Magnetc Codes and Issues | L. Bromberg | 2:00 | Physics limitations and their impact on engineering design of DEMO (ppt, pdf) | A. Turnbull | 2:30 | Radwaste Management Issues (pdf) | L. El-Guebaly | 3:00 | Relevancy of Titian Results to DEMO program (ppt, pdf) | P. Sharpe | 3:30 | Exploring Capability to Calculate Heat Loads on Divertors and First Walls (pdf, ppt) | T. K. Mau | 4:00 | Blankets and Divertor - Maturing Technologies for DEMO? (pdf) | S. Malang | 4:30 | General Discussion about DEMO Design Content | All | 6:00 | Adjourn | ||||||||||||
Friday, 7 September 2007 | ||
| 8:00 | Coffee | INL Host |
ARIES-Pathways Technical Working Group | ||
| 8:30 | Thermal Power Management (ppt, pdf) | R. Raffray |
| 8:45 | Tritium Management Subgroup | P. Sharpe |
| 9:00 | Plant Operations (ppt, pdf) | L. Waganer |
| 9:30 | Discussion of Technical Working Groups Direction and Plans | All |
| 10:00 | Break | |
| 10:15 | Action items, next call, next meeting | F. Najmabadi |
| 11:00 | Adjourn Meeting | |