University of California, San Diego
Room 584, Engineering Building II
Thursday, 10 January 2002 |
||
Administrative | ||
| 8:30 | Review of Agenda | Waganer |
| 8:35 | Status of DOE Fusion Program Priorities and Budgets | Dove |
| 8:50 | Status of ARIES-IFE Study and Near-Term Plans | Najmabadi |
ARIES-IFE Presentations | ||
Systems Analysis and Integration |
||
| 9:00 | ARIES-IFE Systems Topics (ppt) | Miller |
| 9:30 | Heavy Ion Fusion Modeling Update (ppt, pdf) | Meier |
| 9:50 | Break | |
Chamber Beam Physics and Chamber Clearing | ||
| 10:00 | Ballistic Neutralized Transport Simulation Results (ppt, pdf) | Welch |
| 10:30 | Ballistic Neutralized Transport Analytical Model (ppt, pdf) | Yu |
| 10:45 | Self-Pinched Transport Design Considerations (ppt, pdf) | Rose (David) |
| 11:15 | Chamber Clearing with Electrostatic Fields (ppt) | Bromberg |
| 11:45 | Afterglow Phase Issues in Dry Wall Chambers (ppt, pdf) | Tillack for Krasheninnikov |
| 12:05 | Lunch | |
Chamber Beam Physics and Chamber Clearing (continued) | ||
| 1:00 | Target Debris Interaction with Liquid Wall Chamber (pdf) | Hassanein/Abdel-Khalik |
| 1:30 | Wall and Chamber Response with Lead Coolant (ppt) | Haynes/Peterson |
Chamber Wall Engineering and Chamber Clearing |
||
| 2:00 | Design Issues for Beam Insulator Port
(ppt, pdf)
(Raffray's addition) |
Yu/Raffray |
| 2:20 | Overlap Design Points (Dry Wall) and Key Sacrificial Wall Issues Including Recondensation Scoping Analyses (ppt) |
Raffray |
| 3:05 | Break | |
HI Beams and Vacuum System |
||
| 3:15 | HTS and LTS Magnet Designs For Final Focus (ppt) | Bromberg |
| 3:35 | Plasma Window for Vacuum Pumping Minimization (ppt) | Bromberg |
Chamber and Final Optics Nuclear Analysis |
||
| 3:55 |
Liquid Wall Radiological Assessment and Feasibility
of Target Recycling (pdf) |
El-Guebaly |
| 4:25 | Adjourn | |
Friday, 11 January 2002 |
||
Target Fabrication, Injection, and Tracking | ||
| 8:30 | Target Injection in Sacrificial Wall/Aerosol-Filled Chambers (ppt) | Petzoldt |
| 8:45 | Progress in IFE Target Fabrication (ppt) | Goodin |
Safety Analysis | ||
| 9:00 | Safety Analysis Results | Petti |
| 9:30 | Overview of safety issues for potential target materials (pdf, ppt) | Reyes |
| 9:50 | Break | |
Wrap-up Session | ||
| 10:00 | Summarize Action Items/Next Meeting & CC Plans (ppt, pdf) | Najmabadi, Raffray |
| 10:30 | Experimental Opportunities on NIF (pdf) | Brian Mac Gowan |
| 12:00 | Adjourn | |