ARIES Documents -- Meetings Archive
ARIES E Meeting, 13 April 1999
Documented by L. Waganer
Agenda and Presentations
Attendees:
ANL: Billone
INEEL: Petti
MIT: Bromberg
PPPL: Reiersen, Jardin
RPI: Steiner
TSI: Cheng
UCSD: Raffray, Miller, Wang, Tillack
UW: El-Guebaly, Mogahed
Don Steiner
revised neutron source study work plan sent out
now identifies task leaders, added 5th task on safety&licensing
goal is to have something by Snowmass
Plato group will write a white paper and present at Snowmass
Najmabadi's Energy group has sub-session on alt. apps. coordinated by Steiner
conf. calls prior to the meeting to be arranged by sub-group leaders
NAE study on Pu disposition is available, will be distributed
Ed Cheng
attendees at Plato: Parker, Bromberg, Gohar, Wong, Cheng, Bolton, Berk
coordination and discussion of input to Snowmass
4 presentations:
1. Gohar: blanket concepts: molten salt (PuF),
HTGR blanket (graphite coated particles), HTGR with particles in Li flow
2. Cheng: burnup in HTGR concept
3. Wong: system studies: standard tokamak and ST, costing
4. Bromberg: tokamak system study with SC magnet (like ITER-RC)
white papers on Pu and actinide burning in preparation
ARIES-ST PF system:
case with PF on TF shell looks preferable
OB shield design is still an open issue
need to hang PF7 off TF somehow
Action Item: ENG group should decide how to shield PF coils
El-Guebaly:
breeding is OK with PbLi
replacing SnLi in UW design gets TBR~0.9
very thick blanket gets as high as 1.0
need Be to get 1.1
PbLi outlet ~1000 C, goal is to keep SiC below ~1000 C
can handle 1 MW/m2, h=55%
3% burnup leads to ~7 MW-yr/m2 lifetime (one year)
class C waste, very low afterheat
Igor will do manifolding design
ARIES-RS limits are being used for shield design until others are available
Ghoniem suggested 100 dpa limit --> gives less than 7 MW-yr/m2
Raffray:
need firmer and consistent data base for SiC, including design limits
need to collect (and post) reference data for all materials
summarized concept exploration phase
3 blanket options under consideration, 2 divertors
need to consider higher heat flux case for divertor
SOFE paper planned on advanced blanket options
Billone wants to see if ARIES-RS Li/V system could be pushed harder
(he and Majumdar will take a brief look)
Reiersen:
Bromberg, Gouge and Reiersen are working on PF and TF system improvements
need to assess reactor impact with ASC
Laila wants design criteria for shielding -- not a simple thing to do without a coil design
Bromberg will visit ORNL April 22 to interact with researchers
need design criteria for HT SC
checked -RS design to assess cost reductions -- didn't seem too productive
jointed HT coil impacts to be assessed
-- smaller TF, inner PF, advantage of demountability
Miller:
ASC still dead
DREAM reactor analyzed with Nishio
socio-economic issues arising, but difficult to address by Snowmass
Sheffield group (large tokamak with H production) expects input from Miller
Petti:
DOE meeting was held to discuss US/J collaboration
adv. ARIES-RS activities were criticized in DC
Administrative items:
project meeting at UW (need an agenda)
SOFE deadline is "soft"
Top of the page.