Update of Safety Analysis Results
ARIES Electronic Project Meeting
December 4, 1998
Basic Assumptions
Previous Slide
Objectives
|
Next Slide
Mobilization Analysis
|
- Average neutron wall loadings are 2.1 and 4.6 MW/m2 at the inboard and outboard first wall, respectively
- Average neutron wall loading at the inner divertor plate is 0.9 MW/m2
- Homogeneous CP (85% GlidCop AL-15 Cu and 15% water)
- The inboard first wall and shield have a lifetime of 2.86 FPY
- The outboard first wall, blanket and manifold also have a lifetime of 2.86 FPY
- The divertor plate and manifold have a lifetime of 2.86 FPY
- The divertor shield has a lifetime of 40 FPY
- Waste disposal ratings are given after 1 year following shutdown
- Waste disposal ratings are given for compacted wastes
- Off-site doses are calculated using Sv/TBq values calculated by the MACCS2 code under the assumptions of a ground release, atmosphere stability class F, 1 km site boundary and 1 m/s wind speed