Monday, 25 October 2010Doubletree HotelBethesda, MD
| ||
| 8:30 | Coffee, Light Breakfast, Socializing, and Laptop Connections | Doubletree host |
| 9:00 | Welcome, Meeting Logistics and Introductions | A. Opdenaker |
| 9:10 | Summary of Agenda | L. Waganer |
Plans and General Scope | ||
| 9:15 | Updates of the FES Budget and Future Plans | A. Opdenaker |
| 9:45 | Status and Update on Pathways Project | F. Najmabadi |
| 10:15 | Break | |
ARIES Task Results | ||
| 10:30 | Documenting Systems Code Details and Choosing Strawmen (ppt) | L. Carlson |
| 11:00 | Improvements to Power Flow Modeling in the ARIES System Code (ppt) | M. Tillack |
| 11:30 | Comments on ARIES-ACT (Advanced and Conventional Tokamaks) Pre-Strawman (ppt) | L. El-Guebaly |
| 12:00 | Lunch | |
ARIES Task Results | ||
| 1:00 | Pilot Plant: Volt-seconds Needed for Flexible Operation (ppt) | J. Sheffield |
| 1:30 | Plans for Modeling Boundary Plasma/Neutral Characteristics for ARIES (ppt) | T. Rognlien |
| 2:00 | Parametric design curves for extrapolating model divertor studies to prototypical conditions (ppt) | M. Yoda |
| 2:30 | Updates on High Performance He-Cooled Tungsten Divertor Concepts (pptx, pdf) | X. Wang |
| 3:15 | Break | |
| 3:30 | Methodology for Scaling Plant Availability to First of a Kind and One of a Kind (ppt) | L. Waganer |
| 4:00 | Tritium Technology and Regulation Issues for Power Plants (ppt) | L. Cadwallader |
| 4:30 | Break-out discussion of tasks: 1) Engineering (ppt), 2) Physics/Systems (tbd) | |
| 5:30 | Adjourn | |
Tuesday, 26 October 2010Doubletree HotelBethesda, MD
| ||
| 8:30 | Coffee, Light Breakfast, Socializing, and Laptop Connections | DOE host |
| 9:00 | Summary of today's agenda | L. Waganer |
General Fusion Topics | ||
| 9:05 | Update on the Fusion Nuclear Science Program Study Activity | C. Kessel |
| 9:35 | TBD | |
| 10:05 | Break | |
Administrative | ||
| 10:20 | Action Items Assigned/Next Call/Next Meeting/Discussion of future plans | F. Najmabadi |
| 11:05 | Adjourn meeting | |