Room 1610, Engineering Hall, University of Wisconsin
Madison WI
Wednesday, 28 May 2008
| 8:30 | Welcome, Meeting Logistics, Agenda | G. Kulcinski, L. El-Guebaly, L. Waganer | 8:45 | Recent and Future FESAC Activities | S. Prager | |||
ARIES-Pathways Technical Working Groups | |||||||||
| 9:15 | Summary of TRL Methodology & Interim Report (ppt, pdf) | M. Tillack | |||||||
| 10:00 | Open discussion | ||||||||
| 10:30 | Break | ||||||||
| 10:45 | Discussion of ARIES-Pathways Plans | F. Najmabadi | |||||||
| 11:45 | Group photo and lunch | ||||||||
ARIES-Pathways Systems Code Development | |||||||||
| 1:00 | ARIES System Code Updates | Z. Dragojlovic | |||||||
| 1:45 | Preliminary ARIES-RS-DCLL Radial Build for ASC (pdf) | L. El-Guebaly | |||||||
| 2:15 | Stabilizing Shells for ARIES-RS-DCLL System (ppt) | C. Kessel | |||||||
| 2:45 | Lifecycle Waste Disposal and Decommissioning Costs for ASC (pdf) | El-Guebaly/Cadwallader | |||||||
| 3:15 | Break | ||||||||
| 3:30 | Design Guidelines and Cost Algorithms for HT SC Coils (pdf) | L. Bromberg | |||||||
ARIES-Pathways Task Results | |||||||||
| 4:00 | Thermal Effect of Disruptions on a Bare FS Wall (pdf) | R. Raffray | |||||||
| 4:15 | Documentation and Recommendations on Costing Algorithms (pdf) | L. Waganer | |||||||
| 5:30 | Adjourn | ||||||||
Thursday, 29 May 2008
| ||
ARIES-Pathways Task Results (continued) | ||
| 8:30 | New Designs and Analysis on High Performance Divertor (pdf) | X. Wang |
| 9:00 | An Analytic Scheme for CD Power Estimate -- An Update (ppt, pdf) | T.K. Mau |
| 9:30 | Effect of Source Sampling Methods on ARIES-RS NWL Profile (ppt) | P. Wilson |
| 9:50 | Technology Readiness Levels for Plasma Control (pdf) | A. Turnbull |
| 10:20 | Break | |
| 10:30 | Advisory Committee Planning (ppt) | K. Schultz |
| 10:45 | Immediate Plans/Action Items/Next Call/Next Meeting | F. Najmabadi |
| 11:15 | Adjourn Meeting | |