Research Presentations, Room 1025
Engineering Centers Building (ECB), 1550 Engineering Dr
University of Wisconsin, Madison, WI
Tuesday 14 June 2005 | ||
| 8:00 | Coffee | UW Hosts |
Administrative |
||
| 8:30 | Meeting Arrangements and Logistical Info | L. El-Guebaly |
| 8:35 | Review of Meeting Agenda | L. Waganer |
| 8:40 | Status of ARIES CS Study | F. Najmabadi |
| 9:00 | Summary of IEA Socio-Economics Aspects of Fusion Workshop (pdf, PowerPoint) | L. Waganer |
| 9:30 | Summary of ISFNT Meeting | L. El-Guebaly |
Compact Stellarator Reactor Integrated Systems Assessment |
||
| 9:45 | Status of Systens Codes Studies (pdf, PowerPoint) | J. Lyon |
| 10:30 | Discussion of Systems Codes Results | All |
| 10:45 | Break | |
Administrative |
||
| 11:00 | Welcome to the University of Wisconsin, Madison | J. Kulcinski |
Compact Stellarator Power Plant Physics Basis |
||
| 11:15 | Assessment of New 2-FP and 3-FP Plasma and Coil Configurations (pdf) | L-P Ku |
| 12:00 | Lunch | |
| 1:00 | Update on Beta Limits for Compact Stellarators (pdf, PowerPoint) | A. Turnbull |
| 1:20 | MCNP/CAD activities and Preliminary 3-D Results (pdf, PowerPoint) | M. Wang |
| 1:50 | Divertor Heat Load Analysis (pdf, PowerPoint) | T.K. Mau |
| 2:20 | Possible Configurations for Divertor Design (pdf, Power Point) | H. McGuinness |
| 2:40 | Break | |
Compact Stellarator Reactor Engineering Assessment |
||
| 3:00 | ARIES-CS Divertor Design & Analysis: Engineering Plan of Action (pdf, Power Point) | T. Ihli |
| 3:30 | Thermal Analysis of Helium-Cooled T-tube Divertor (pdf, Power Point) | S. Abdel-Khalik |
| 4:00 | Status of Engineering Assessment of Power Core and Maintenance (pdf, Power Point) | R. Raffray |
| 4:20 | Nuclear Issues for LiPb/FS/He System with Internal VV (pdf) | L. El-Guebaly |
| 4:45 | Shielding Options for FP Maintenance Approach with External VV (pdf) | L. El-Guebaly |
| 5:15 | Adjourn | |
Wednesday 15 June 2005 |
||
Compact Stellarator Reactor Engineering Assessment (Cont'd) |
||
| 8:00 | Coffee | UW Hosts |
| 2:20 | Status of Modular and Field Period Replacement Maintenance (pdf, Power Point) | X. Wang |
Compact Stellarator Safety Analysis |
||
| 8:30 | Tritium Permeation and Extraction Issues for the ARIES-CS (pdf, PowerPoint) | B. Merrill |
| 9:00 | Updated LOCA/LOFA Analyses for Blanket and Shield Only Regions (pdf) | C. Martin |
| 10:15 | Discussion, Action Items, and Plans | F. Najmabadi |
| 11:00 | Adjourn | |