Building7, Room 120
General Atomics, La Jolla, CA
Thursday 24 February 2005 | ||
| 8:00 | Coffee | GA Hosts |
Administrative |
||
| 8:30 | Welcome to General Atomics and Logistical Info | A. Turnbull |
| 8:35 | Review of Meeting Agenda | L. Waganer |
| 8:40 | Status of ARIES CS Study | F. Najmabadi |
Compact Stellarator Reactor Integrated Systems Assessment |
||
| 9:00 | Results of Systems Code Studies | J. Lyon |
| 9:45 | Break | |
Compact Stellarator Power Plant Physics Basis |
||
| 10:00 | Attractive 2-FP and 3-FP Plasma and Coil Configurations - - Recent Configuration Development Results (pdf, Power Point) | L-P Ku |
| 11:00 | Field Tracing, Alpha Loss Prediction, and Divertor Requirements (pdf) | T.K. Mau |
| 11:30 | Update on Parallel Code Development for Divertor Design Requirements (pdf, Power Point) | H. McGuinness |
| 11:45 | General Discussion on Divertor Physics Issues | |
| 12:00 | Lunch | |
| 1:00 | Modeling of Particle and Power Control for Compact Stellarators (pdf, Power Point) | A. Grossman |
| 1:30 | Beta Limits for Compact Stellarators - Are They Real? (pdf) | A. Turnbull |
Compact Stellarator Power Plant Engineering Assessment |
||
| 2:00 | Power Core Assessment and Evaluation - Next Steps (pdf, Power Point) | R. Raffray |
| 2:20 | Comparison of 2-FP and 3-FP CS Geometry Configurations (pdf, Power Point) | X. Wang |
| 2:40 | Dual-Cooled Blanket Modular Replacement Design Approach (pdf, Power Point) | X. Wang |
| 3:10 | Changes to LiPb/FS/He System and Implications for Radial Build (pdf) | L. El-Guebaly |
| 3:40 | Break | |
| 3:55 | EU-Helium-Cooled Divertor Design Study Results (pdf, Power Point) | T. Ihle |
| 4:25 | ARIES-CS Divertor Design & Analysis: Engineering Plan of Action (pdf, Power Point) | T. Ihle |
| 4:45 | CS Coil Design Definition/Fabrication Definition | L. Bromberg |
| 5:15 | Adjourn | |
Friday 25 February 2005 |
||
| 8:00 | Coffee | GA Hosts |
Compact Stellarator Safety Analysis |
||
| 8:30 | Pressurization Accidents in ARIES-CS (pdf, PowerPoint) | B. Merrill |
| 9:00 | LOCA/LOFA Analyses for Blanket and Shield Only Regions - LiPb/FS System (pdf, Power Point) | C. Martin |
| 9:30 | General Discussion on Safety and Engineering Issues | |
| 10:00 | Break | |
| 10:15 | Discussion, Action Items, and Plans | F. Najmabadi |
| 11:00 | Adjourn | |