Monona Terrace Convention Center, Hall of Ideas - Room H
Madison, WI
(following TOFE meeting)
Thursday, 16 September 2004 | ||
Administrative |
||
| 1:00 | Welcome, Arrangements, and Logistical Info | L. El-Guebaly |
| 1:05 | Review of Agenda | L. Waganer |
| 1:10 | Status of ARIES CS Study | F. Najmabadi |
Compact Stellarator Reactor Engineering Assessment |
||
| 1:15 | Update of the ARIES-CS Maintenance (PowerPoint, pdf) | X. Wang |
| 1:30 | Likely Blanket Structure and Coolant Materials | S. Zinkle |
| 2:00 | Preliminary LOCA Analysis for LiPb/FS System (PowerPoint, pdf) | Jake Blanchard |
| 2:20 | Power Core Options, Decision Factors, and Selection for Phase II (PowerPoint, pdf) | R. Raffray |
| 2:40 | Break | |
| 3:00 | Summary of Power Core Materials & Fabrication Unit Costs (PowerPoint, pdf) | L. Waganer |
Compact Stellarator Reactor Physics Basis |
||
| 3:20 | Assessment of QH Class of Compact Stellarator Configurations (PowerPoint, pdf) | L-P Ku |
| 3:50 | A Look At Another Prompt Alpha Loss | P. Garabedian |
Compact Stellarator Reactor Engineering Assessment |
||
| 4:10 | Neutron Wall Loading Profile Using CAD/MCNP Interface (PowerPoint, pdf) | Mengkuo Wang |
Compact Stellarator Reactor Integrated Systems Assessment |
||
| 4:25 | Revision of Previous Results and Progress on Systems Code (PowerPoint, pdf) | J. Lyon |
Summary and Wrapup |
||
| 4:50 | Meeting Wrapup and Action Items | F. Najmabadi |
| 5:00 | Adjourn | |