Hilton Garden Inn
Livermore, CA
(hosted by LLNL)
Call-in Number 925-292-2000 (hotel), Ext 5115.
Tuesday, 6 May 2003 |
||
| 12:30 | Adjourn Town Meeting for Lunch | |
Administrative |
||
| 1:30 | Welcome to Livermore + Logistical Information | Meier |
| 1:35 | Review of Agenda | Waganer |
| 1:40 | Status of ARIES IFE Study | Najmabadi |
| 1:50 | DOE Comments | Opdenaker |
ARIES-IFE Thick Wall Assessment |
||
Chamber/Beam Physics, Beam Transport, and Chamber Clearing |
||
| 2:00 | Assessment of Streaming Instabilities for Neutralized-Ballistic Transport (pdf, Power Point) | Rose |
| 2:20 | Vortex Extraction (pdf) | Peterson |
Chamber Engineering |
||
| 2:40 | A "PCA" Version of 304 SS for HYLIFE (MS Word) | Moir |
| 2:55 | Discussion | |
| 3:00 | Break | |
| 3:15 | Conceptual Design for HYLIFE Maintenance (pdf, Power Point, mpeg animation) | Abbott |
| 3:45 | Nozzle Motion/Phasing over Reactor Lifetime (pdf, Power Point) | Waganer |
Beamline Engineering |
||
| 4:15 | Neutralized Drift Compression (pdf, Power Point) | Welch |
Chamber and Final Optics Nuclear Analysis |
||
| 4:35 | Waste Disposal Assessment for the Final Focusing Magnets in the RPD-2002 (pdf, Power Point) | Latkowski |
Target Fabrication, Injection, and Tracking |
||
| 4:50 | Summary of Target Factory Labor Assumptions (pdf, Power Point) | Petzoldt |
| 4:55 | Mitigation of Target Assembly Step Failure | Petzoldt |
| 5:00 | Adjourn Meeting | |
Wednesday, 7 May 2003 |
||
| 8:00 | Coffee | LLNL Hosts |
ARIES-CS, Assessment of Compact Stellarator as a Power Reactor |
||
Configuration Development/Optimization |
||
| 8:30 | CS Configuration Development and Key Issues (pdf, Power Point) | Ku |
| 9:15 | Discussion of Configuration Examination and Optimization (pdf, Word) | Led by Neilson |
| 9:30 | Break | |
| 9:45 | Progress on Systems Code Application to CS reactors (pdf, Power Point) | Lyon (phone-in) |
| 10:30 | Discussion of Systems Code Utilization | Led by Najmabadi |
| 10:40 | A Two-Field Period Candidate for ARIES-CS (pdf) | Garabedian |
| 11:30 | Ideal Stability Calculations for ARIES Compact Stellarator Configurations (pdf) | Turnbull |
| 11:50 | High-beta Experiments on W7AS and Possible Implications (pdf) | Zarnstroff |
| 12:10 | Discussion | |
| 12:20 | Lunch | |
Engineering Development/Optimization |
||
| 1:20 | Status Update of NSCX and QPS Projects (pdf, Power Point) | Neilson |
| 1:50 | Radial Build Definition for LiPb/SiC System (pdf) | El-Guebaly |
| 2:20 | ECRF Heating on CS Reactors (pdf, Power Point) | Mau |
| 2:50 | Demountable S/C Coil Options (Benefits vs. Risks) (pdf, Power Point) | Bromberg |
| 3:20 | Break | |
| 3:30 | Safety Issues Related to FLiBe/FS Blanket and VV Placement (pdf, Power Point) | Merrill |
| 3:45 | Scoping of Modular CS Engineering Configuration (pdf, Power Point) | Raffray, Wang, Malang |
| 4:30 | Stellarator Divertor Design and Optimization with NCSX Examples (pdf, Power Point) | Koniges |
| 5:00 | Discussion of Engineering Study Approach/Plan | Raffray |
| 5:20 | Review of Generated Action Items | Raffray |
| 5:30 | Summarize of Study Plans and Next Meeting/CC Dates | Najmabadi |
| 5:30 | Adjourn Meeting | |