Wednesday, 24 October 2001 (314-232-7034) |
||
| 11:00 | Roll Call | |
Safety Analysis (continued) | ||
| 11:05 | Safety Assessment for Potential Target Materials: Radioactivity vs Chemical Toxicity (pdf, ppt) |
Reyes |
Chamber Physics and Chamber Clearing | ||
| 11:20 | Dry Wall Survival Studies for the HIB Target (pdf) | Haynes |
| 11:40 | Liquid Wall Chamber Dynamics (pdf@UW, pdf@UCSD, ppt) | Peterson |
| 12:00 | Propagation of HI Beams in Chamber Metal Vapor Atmosphere (pdf, ppt) | Olson |
Chamber Wall Engineering | ||
| 12:20 | Design Approaches for Beam Isolation Rings (pdf, ppt) | Yu |
| 12:40 | Remaining action items on dry walls, Overlapping Dry Wall Design Regions (pdf), and Sacrificial Wall Analysis (pdf, ppt) |
Raffray |
| 1:10 | break | |
| 1:20 | Design Considerations for Thin Liquid Film Wall Protection Systems (ppt, pdf) |
Abdel-Khalik and Yoda |
| 1:40 | Chamber Aerosol Clearing (pdf, ppt) | Bromberg |
Chamber and Final Optics Nuclear Analysis | ||
| 1:55 | Target Recycling: Problem Definition and Preliminary Analysis (pdf) | El-Guebaly |
| 2:15 | Shock-Interface and Shock-Structure Interactions (pdf) | Anderson |
Assessment of Off-Normal Events | ||
| 2:35 | Update of Off Normal Event Assessment | Steiner |
HI Magnet Engineering |
||
| 2:55 | Magnet Considerations for ARIES-IFE (pdf, ppt) | Bromberg |
Meeting Summary | ||
| 3:15 | Summarize Action Items | Najmabadi, et al. |
Wednesday, 17 October 2001
(314-233-7587) |
||
| 10:20 | Roll Call | |
Administrative |
||
| 10:25 | Review of E*Meeting Procedures, Agenda | Waganer |
| 10:30 | Status of DOE Fusion Program Priorities and Budgets | Dove |
| 10:35 | Status of ARIES-IFE Study and Near-Term Plans | Najmabadi |
ARIES-IFE Presentations | ||
Systems Analysis and Integration | ||
| 10:40 | ARIES-IFE Systems (pdf, ppt) | Miller |
| 10:55 | Recent Progress and Next Steps on HI Driver Modeling (pdf, ppt) | Meier |
Target Fabrication, Injection and Tracking | ||
| 11:30 | In-Chamber Target Tracking and Other Target Injection
Considerations (pdf, ppt) |
Petzoldt |
| 11:50 | Status of IFE Target Fabrication (pdf, ppt) | Goodin |
Safety Analysis | ||
| 12:10 | Update on IFE Safety Work for ARIES (pdf, ppt) | Petti |
| 12:40 | Extra discussion time | |
| 12:55 | End of Call | |