Hilton Garden Inn
Livermore, CA
Minutes
(see also Tritium Town Meeting presesntations)
Thursday, 8 March 2001 |
||
Administrative |
||
| 9:00 | Welcome and Administrative Details | Meier |
| 9:05 | Review of Agenda and Goals of the Meeting | Waganer |
| 9:10 | Status of DOE Fusion Program Priorities and Budgets | Dove |
| 9:30 | Status of ARIES-IFE Study and Near-Term Plans, Status of ARIES-AT FED papers |
Najmabadi |
Meeting Summaries |
||
| 9:45 | Summary of ARIES Tritium Town Meeting (pdf, ppt) | Tillack |
| 10:15 | Summary of HI-Beam Pinched-Transport Workshop | Olson |
| 10:45 | Break | |
ARIES-IFE Presentations |
||
Systems Analysis and Integration |
||
| 11:00 | Driver Parametric Study Results,
Cost Models, Rep Rate vs Yield, Target Factory Costs, Economy of Scale (pdf, ppt) |
Miller |
| 11:30 | Heavy Ion Driver Systems Model Update (pdf, ppt) | Meier |
| Direct Drive Gain Curve Update (pdf, ppt) | Meier | |
| 12:00 | Lunch (Informal discussion of plans for protected wall chamber assessment) | |
Chamber Wall Engineering |
||
| 1:30 | Assessment of Carbon and Tungsten Dry Wall Chamber Walls under IFE Energy Depositions (pdf, ppt) | Raffray |
| 2:15 | Parametric Results for Gas-Filled Chamber Dynamics Analysis (ppt) | Peterson (Haynes) |
| 3:00 | Migrating ITER Tritium and PFC Materials Experience to IFE (pdf, ppt) | Federici |
| 3:30 | Break | |
| 3:45 | Chamber Engineering Session Wrapup | Raffray, et al |
| 4:00 | Findings and Recommendations from Wetted-Wall Designs (pdf, ppt) | Latkowski |
Chamber Nuclear Analysis |
||
| 5:00 | Activation Issues for Candidate Coating/Hohlraum Materials (pdf) | El-Guebaly |
| 5:30 | Adjourn | |
Friday, 8 March 2001 |
||
Final Optics (Laser + HI) |
||
| 8:30 | Effects of mirror defect and damage on Beam Quality (pdf, ppt) | Mau |
Target and Chamber Physics (Dynamics) |
||
| 9:00 | Indirect Drive Options for Laser IFE | Tabak |
| 9:30 | Advanced Fuel Target Designs and Related Energy Cycles | Perkins |
| 10:00 | Break | |
Target Fabrication, Injection, and Tracking |
||
| 10:15 | Update on Target Fabrication, Injection, and Tracking (pdf, ppt) | Goodin |
| 10:45 | Direct Drive Target Protection During Injection | Alexander |
| 11:15 | Tritium permeability in different target materials | Sze |
| 11:35 | Integrated Target Reflectivity (pdf, ppt) | Mau |
| 12:00 | Lunch (Task Leaders Write Action Item Plans) | |
Safety Analysis |
||
| 1:15 | Status of ARIES-IFE Safety and Environmental Activities (pdf) | Petti |
| 1:45 | Systems Consideration Issues Relating
to Reliability, Uncertainty, and Operation (Steiner stuff) (pdf, ppt) |
Petti |
Wrap-up Session |
||
| 2:15 | Summarize Action Items | Najmabadi, et al |
| 2:45 | Next Meeting Plans | Najmabadi |
| 3:00 | Adjourn | |