Princeton Plasma Physics Laboratory
Room A104
Monday, 18 September 2000
Administrative | ||
| 8:30 | Review of Agenda and Goals of the Meeting | Waganer |
| 8:45 | Status of DOE Fusion Program Priorities and Budgets | Dove |
| 9:00 | Summary of ARIES Studies and
Immediate Goals (ARIES-AT Final Report Outline and Instructions) | Najmabadi |
ARIES-AT Final Design Presentations | ||
Physics Assessment | ||
| 9:15 | Outline of ARIES-AT Physics Chapter and Issue Discussion (PDF) | Jardin |
| 9:45 | Evolution of AT physics from ARIES-RS to ARIES-AT (quicktime, PPT) | Kessel |
| 10:15 | Break | All |
| 10:30 | Heating and Current Drive Systems for ARIES-AT (quicktime, PPT) | Mau |
| 11:00 | Discussion of Next Year's MFE Physics Activities (quicktime, PPT) | Kessel |
System Studies | ||
| 11:30 | Final Strawmen Results and Discussion | Miller |
| 12:00 | lunch | |
ARIES-AT Engineering | ||
| 1:00 | Power Core Maintenance Approach and Maintainability Analysis (quicktime, PPT) | Waganer |
| 1:45 | Final TF and PF Design (quicktime, PPT) | T. Brown |
| 2:15 | Final TF and PF Structural Analysis Results (quicktime, PPT) | Dahlgren |
| 2:45 | Break | All |
| 3:00 | Final HTS Coil Definition | Bromberg |
| 3:30 | Waste Issues and Radiological Inventory in LiPb (PDF) | El-Guebaly |
| 4:00 | Final Heat Transfer System and Coolant Processing System | Sze |
Safety Studies | ||
| 4:30 | Safety and Environmental Assessment of ARIES-AT (PDF) | Petti |
ARIES-AT Program | ||
| 4:30 | Plans for Final Report | Najmabadi |
| 5:30 | Adjourn | |
|
Tuesday, 19 September 2000 | ||
ARIES-IFE Presentations | ||
Drivers | ||
| 8:30 | HI Drivers | Ed Lee |
| 9:15 | HI Driver Systems Modeling (PDF, word ) | Meier |
Target and Chamber Physics | ||
| 9:45 | IFE Target Design at LLNL and Output Spectra from Direct and Indirect Drive IFE Targets | Perkins |
| 10:30 | Break | All |
| 10:40 | Final Transport of HI Beams | Olson |
| 11:25 | Plasma Channel-Based Final Transport System | Yu |
| 12:10 | Lunch | All |
| 1:10 | Target Output from Laser Targets (PDF, quicktime, PPT) | Peterson |
| 1:30 | Parametric Survey of Gas-Filled Dry Wall Chamber (PDF) | Haynes/Peterson |
Chamber Nuclear Analysis | ||
| 2:00 | Initial Parameters for Nuclear Analysis and FW Issues (PDF) | El-Guebaly |
| 2:30 | Shielding Considerations for HIB with Preformed Channels (PDF) | El-Guebaly (for Sawan) |
| 3:00 | Break | All |
Final Optics | ||
| 3:10 | Final Optic Options, Requirements and Damage Threats (quicktime, PPT) | Tillack |
Target Fabrication, Injection, and Tracking | ||
| 3:40 | IFE Target Fabrication Plans and Progress (PDF) | Goodin |
| 4:00 | IFE Target Fabrication Activities (quicktime, PPT) | Gobby |
| 4:20 | Target Injection in a Gas-Filled Chamber (PDF) | Goodin |
| 4:40 | Design of the Target Injection and Tracking Experimental System (PDF) | Petzoldt |
|
Wednesday, 20 September 2000 | ||
Systems Analysis and Integration | ||
| 8:30 | Systems Consideration Issues Relating to Reliability, Uncertainty, and Operation (PDF) | Steiner |
| 9:00 | Systems Code Development and Design Window Assessment | Miller |
| 9:40 | Target Gain Curve Modeling (quicktime, PPT) | Meier |
Safety Analysis | ||
| 10:30 | Preliminary Safety Analysis Findings (PDF) | Meier |