Impact Of Large Electrical Generating Plants(> 1.5 GWe)
If size exceeds maximum plant size on Utility system:
Additional spinning and operational reserves are needed.
Additional siting costs may be incurred to cover increased substation and transmission requirements.
Utility production costs may increase due to production dispatch and operating modes of other generating plants.